Schedule showing materials supplied by the Cochin Shipyard Limited
|
Sl. No. |
Material |
Unit |
Unit |
Free issue |
Place of delivery |
|
|
1. |
Tor steel / Mild steel rods |
Tonne |
|
|
Anywhere in Cochin Shipyard. |
|
|
2. |
Structd. Steel |
Tonne |
|
|
|
|
|
3. |
GI / Al. sheets |
Tonne |
|
|
|
|
|
4. |
Cement |
Tonne |
|
|
|
|
|
5. |
Water |
1000 Litres |
|
|
|
|
|
The construction of
cement godowns should be done in places approved by the Engineer-in-charge
and it is responsibility of the contractor to keep the cement in born dry
conditions. Opening the cement store
should be done in the presence of CSL officials, and the store should be made
available for checking stock as and when required by Engineer-in-charge of
the work. |
||||||
|
Signature of the
Contractor |
Signature of Dy. General Manager
(Civil Engineering) for and on behalf of
the Cochin Shipyard Limited |
|||||